CORROSION AND CATHODIC PROTECTION:

Corrosion rate of the metal can be significantly reduced by electro chemical protection by decreasing the corrosion potential is known as Cathodic protection (CP)

We have a capability to Design, Install, Test & Commission, CP system for all kind of Metallic structures, Underground Pipeline, Storage Water / Fuel Tanks, metal surfaces permanently exposed to seawater or marine sediments.

Installation includes

Rectifier Unit, Anode Ground beds horizontal and vertical, minus connection on pipes, surge protection, polarization cell, Potential Test Stations, Test Coupons, Cable laying, Reference Electrodes, Test Bonding Stations, Isolation Couplings, Painting, Impressed current CP for Tank Bottom, Protection for inside of the Tanks, Sacrificial Anodes for new pipe installations as well as current balancing requirements etc.

Installation of Submarine pipelines and risers

Protection design and installation for Current densities in sea water, sea mud, driving potential calculations for hot fluids water injection pipelines, rigid and flexible pipelines, Protection of Platforms etc.

CIPS PIPE TO SOIL POTENTIALS MEASURED AT FAULT EPICENTERS

THE EFFECTIVE RANGE OF EACH CP POWER SOURCE DETERMINED AT TEST POSTS

 

BURRIED PIPELINE SURVEY

 

 

CORROSION (CP) SURVEY AT YANBU- MADINAH WATER TRANSMISSION PIPELINE

 

 

 

COATING REPAIR AT YANBU-MADINAH WATER TRNSMISSION PIPELINE

CP & OTHER PROJECTS FOR SWCC EXECUTED FOR AL BALAD CONST. UNDER GM JMD ARABIA MANAGEMENT CO.
  1. Potential Survey and Study for the Solution to Potential Drops.

Location: Yanbu Filling Station –Yanbu

July, 2002

  1. CP System Installation on SWCC pipeline offsetting any influence due to 16-inch Yanbu Al Bahar to Yanbu Al Nakhal

Location: Yanbu Al Bahr starting from SWCC filling Station

July, 2003

  1. Assessment of CP System for Phase – 1, 32-inch underground pipeline from Musajeed to Madinah Al Munawara.

Y/T/G/002 – Nov, 2008

  1. Installation, Testing & Commissioning of CP System for Four (4) Tanks Phase – 2

Y/I/G/ 0015 – August, 2009

  1. Assessment of CP System for Yanbu Plant Phase – 1

Y/I/G/0017 – October, 2009

  1. Upgrading 32” pipe line from Musajeed to Madinah.

Y/T/G/011 – July, 2010

  1. Coating Repair of 32” Pipe line from Musajeed to Madinah. Y/T/G/0013 – Sep, 2010

 

  1. Y/E/G/0056 Grounding & Lightning Protection Assessment, June 2012

 

  1. 550 km Pipeline Corrosion Assessment from Yanbu to Madinah

 

  1. 2700/SS/601 Shifting of 13.8 Switchgear and MV Cable laying at Wajh Plant.

 